ISO No. R&D Topic
OP-3-04 Project File Naming Convention and Storing Procedure
OP-3-05 General Procedure in Hydrological Modeling
OP-3-06 Procedure in Low Flow Analysis
OP-3-07 Cross-Section Conversion in MIKE 11
OP-3-08 Hydraulic Modeling in using MIKE 11
OP-3-09 Global Mapper Quick Reference
OP-3-10 Hydrologic Modeling in using HEC HMS
OP-3-11 Supervision Checklist for Dam Safety Inspection
OP-3-12 Model set up in MIKE 21 and MIKE Flood
OP-3-13 Guidelines to Carry out Flood Investigation on Urban Area
OP-3-14 Guidelines in using Snyder UH in HEC-HMS
OP-3-15 DYNHYD Hydrodynamic Modeling
OP-3-16 Checklist for Preparation of Report for Submission
OP-3-17 Checklist for M11 Model Setup
OP-3-18 Low-Flow Estimation using HP 12
OP-3-19 Derivation of Design Floods using HP 11
OP-3-20 Derivation of Design Rainfall using MSMA
OP-3-21 Estimating Population Projection and Water Demand
OP-3-22 Estimation of Irrigation Water Demand
OP-3-23 Derivation of Design Floods using Modified Rational Method and Modified Rational
Method Hydrograph Method in MSMA
OP-3-24 Runoff Estimation for Ungauged Catchment
OP-3-25 Soil Erosion Estimation using EMC Method
OP-3-26 XP SWMM model Set -up
OP-3-27 Derivation of Design Flood for Urban Drainage Design Submission using Modified
Rational Method
OP-3-28 Preparation of Sediment Modeling and its Data Requirement
OP-3-29 HecResSim Simulation
OP-3-30 Dam Break Modeling
OP-3-31 Guideline on Gap Filling of Rainfall and Evaporation Data
OP-3-32 Flood Damage Assessment using JPS Procedure
OP-3-33 Soil Loss Computation using ArcGIS
 
   
 
Associated Organization:
 
   

 

 



Copyright © 2006 - 2011 G&P Professionals Sdn. Bhd. All Rights Reserved. Best viewed at 1024 x 764 resolution with IE 5.x.