  Capacity Study for Lame Extension of Penang Bridge, Penang, Malaysia.
Client: Intria Bhd (UEM Group)
Scope: The Penang Bridge Concession Company, Intria Bhd under the UEM Group intended to extent the existing Penang Bridge due to congestion problem. Traffic Study was done to evaluate the proposed bridge extension.
 
 
 
  Penang LRT Studies
Client: Penang Government (Privatization Proposal)
Scope: The Study was done in association with Bombardier Transportation and SNC-Lavalin of Canada as a privatization proposal to the Penang Government. The light rail transit (LRT) studies focused on Demand Forecasting, Route Selection and choice of Rolling Stocks covering Penang Island and Mainland Urban Centres.
 
 
  Proposed Bus Priority Scheme for Kuala Lumpur
Client: Dewan Bandaraya (City Hall) Kuala Lumpur
Scopes: This was done as a Pilot Study to assess the need and implementation of Bus Priority Scheme in Kuala Lumpur. The Study included evaluation of Alternative Measures, Design and Implementation of the Scheme adopted based on the Study performed.

The project was done in association with Acer Consultants Sdn. Bhd.
 
 
  Remedial Work Design of Sg. Pasai Bridge, Sibu, Sarawak.
Client: Tradewinds Plantation Services S/B
Scopes: Design of a tilted abutment and approach embankment for 70m long, three span bridge across Sg. Pasai.
 
 
  Geotechnical works (foundation and ground treatment) for Kuala Lumpur – Putrajaya Dedicated Highway.
Client: Leighton Contractors (M) Sdn Bhd (Motibina Sdn Bhd)
Scopes: Review on the geotechnical works which inclusive of based pile, caission pile and ground treatment of the 26km Kuala Lumpur – Putrajaya Dedicated Highway.
 
 
  Kajang Traffic Dispersal Ring Road (Section 3C) - SILK
Client: Sunway Construction Sdn Bhd
Scopes: Ground treatment design (piled embankment, stone column, surcharge, etc) of the 3.5km Kajang Dispersal Ring Road at Section 3B and 3C.
 
 
  Investigation & Remedial Design of NSE Central Link & KLIA Expressway KM 21.5 to KM 22.1
Client: Pengurusan Lebuhraya Berhad
Scopes:

Investigation into the serviceability problem encountered at the affected stretch.

The works involved planning of subsurface investigation and instrumentation works to determine the causes of the serviceability problem and propose appropriate long-term remedial measures.




 
 
  Design and Construction of The Central Workshop Maintenance Railway Development at Batu Gajah, Perak.
Client: Kinta Samudra Sdn Bhd
Scopes:

Design and construction of the central workshop over ex-mining land.

The design and construction component involved piling works for the building structures, ground treatment using vertical drain and vibro - compaction for railway embankment and pond reclamation works.





 
 
  Bandar Botanic Development, Klang.
Client: Harum Intisari Sdn Bhd
  Scopes: Design of ground treatment and foundation system for bridges and all roads within the development ensuring long term performance of these infrastructures and to provide comfortable driving experience of all users.  
 
 
  Bandar Botanic Development, Klang.
Client: Harum Intisari Sdn Bhd
  Scopes: Design of ground treatment and foundation system for bridges and roads within the development over soft compressible Marine Clay.  
 
 
  Design and Construction of Jelutong Expressway, Penang, Malaysia.
Client: IJM Corporation Bhd / JKR Penang
  Scopes: Engineering Design, Construction and Completion of the Jelutong Expressway including interchanges and bridges implemented under privatization concept.  
 
 
  Design and Construction of Interchange Access to Water Front City, Penang, Malaysia.
Client: IJM Corporation Bhd / JKR Penang
  Scopes: Engineering Design, Construction and Completion of Interchanges and Upgrading Works for Waterfront City (e-Gate) developed by IJM Corporation Bhd.  
 
 
   
 